Cameras Photos History
HomeDisclaimerContact UsSearch
 
Traffic Conditions Bridge Design News and Updates
Grand Opening Environment Building the Bridge
Photos
previous | Back to Thumbnails | next
On the barge

The span started lowering at 10:00am and was on the barge at 2:00 pm. After the span is on the barge, crews still have more work to do to ensure that it is safely on the barge and ready to go.