Cameras Photos History
HomeDisclaimerContact UsSearch
 
Traffic Conditions Bridge Design News and Updates
Grand Opening Environment Building the Bridge
Photos
previous | Back to Thumbnails | next
Crews cutting

Demolition crews ride man baskets to make cuts into the steel truss that will be lowered. Once the strand jacks are installed, the steel will be cut in designated locations to free the center span.